Indoor Air Quality Compliance Testing

    Indoor Air Quality Compliance Testing

    Independent indoor air quality assessors · Since 1999

    Last reviewed:

    Certification and project specifications set specific indoor air quality criteria, testing windows and documentation. We plan testing around the scheme version and project requirements, check the building is ready before we test, and report results in the format your assessor or client needs.

    Established 1999 · 2,500+ assessments · SafeContractor approved · BOHS Affiliate Member · London & South East

    Standards and schemes we test for

    Requirements depend on the scheme, its version and the project specification, so we confirm the criteria with you and your assessor before testing.

    Standard selector
    SchemeWhen testing usually happensParameters typically includedLaboratory analysis?
    BREEAM (indoor air quality issue)After completion and before occupationFormaldehyde and TVOC; others as the scheme version requiresUsually, for formaldehyde and TVOC
    WELL v2 (Air concept)Pre-testing ahead of formal performance verificationPM2.5, PM10, TVOC, formaldehyde, CO₂, CO, ozone and others as requiredFor some parameters
    BS 40102-1:2023In use, to rate indoor environmental qualityPM2.5, CO₂, TVOC, NO₂, CO, ozone, alongside thermal, lighting and acoustic factorsDepends on the rating approach
    Project or employer requirementsAs specifiedAs specifiedAs specified

    Swipe sideways to see the full table →

    Pre-test readiness checklist

    Most failed tests come from testing too early. Before we attend, we check:

    • Fit-out complete, including furniture and floor finishes
    • Final clean completed and the date recorded
    • HVAC commissioned and running in normal mode
    • Occupancy status agreed (usually unoccupied for BREEAM testing)
    • Products and materials used, including adhesives, paints and sealants
    • Windows, doors and ventilation mode agreed for the test
    • Drawings and a room schedule showing proposed test locations

    How compliance testing works

    A compliance test follows five steps.

    1. Confirm criteria

      We confirm the scheme, version, parameters and limits with you and your assessor.

    2. Readiness check

      We check the building against the readiness checklist and agree the test date.

    3. Sample

      We sample at representative locations using the method each parameter requires.

    4. Analyse

      Samples needing laboratory analysis are sent for analysis; real-time results are downloaded and checked.

    5. Report

      We report results against each criterion, with locations, methods and any limitations.

    What happens if results don't meet the criteria?

    It is common for a first test to show elevated formaldehyde or TVOC, especially soon after fit-out. We identify the likely sources, advise on flushing out, ventilation or product changes, and retest when the building is ready. Our report records both the original and repeat results.

    Limitations and what this assessment cannot tell you

    • Results apply to the conditions and locations tested on the day
    • We test to the criteria of the scheme version you confirm; interpretation of credits rests with your assessor
    • WELL pre-testing provides the necessary groundwork and assurance ahead of formal performance verification.

    What your report includes

    • Scheme, version and criteria tested against
    • Readiness checks and building condition at the time of testing
    • Test locations on a plan
    • Methods and laboratory used for each parameter
    • Results against each criterion
    • Retest results where applicable
    • Limitations and assumptions

    Check readiness for IAQ compliance testing

    Free, no-obligation — we aim to reply promptly during business hours.

    🔒 Your details are private and never shared with third parties.

    Frequently Asked Questions

    Yes. Our reports set out the scheme version, criteria, methods, locations and results in the format BREEAM assessors expect. This evidence supports your assessor in awarding the relevant credits.

    We carry out independent pre-testing against the WELL v2 Air concept thresholds, so issues are found before formal performance verification, which is carried out by a WELL Performance Testing Agent.

    BS 40102-1:2023 is a British Standard code of practice for health, well-being and indoor environmental quality in non-domestic buildings. It rates buildings on indoor air quality alongside thermal comfort, lighting and acoustics, using measured data.

    Once fit-out and the final clean are complete and the ventilation is running normally. Booking a readiness check first avoids paying for a test that is likely to fail.

    We identify the likely source, advise on corrective action such as flushing out or ventilation changes, and retest when the building is ready.

    Need Indoor Air Quality Testing?

    Get a no-obligation quote. We provide IAQ testing, ventilation assessment and environmental monitoring across London and the South East.

    We use cookies to measure how our site and adverts perform. You can accept or reject non-essential cookies. Privacy policy