Free guide for facilities teams

    How to Read a TR19 Ventilation Hygiene Report

    A TR19 report should tell you three things clearly: what condition your systems are in, what action is justified, and how you will know the action worked. This guide explains how to check that yours does.

    1. What a complete report should contain

    • Scope and purpose — why the survey was done (routine, pre-clean, post-clean, complaint, handover) and which systems were included.
    • System register — each system identified, with its type, what it serves and where it is.
    • Test locations on a plan or schematic — you should be able to find every test point in the building.
    • The test method used at each location — and why that method was chosen.
    • Individual results — every reading, not just a summary or pass/fail.
    • Photographs linked to locations — a photo you can't match to a test point proves very little.
    • Classification against TR19 criteria — for each system, not the whole building.
    • Inaccessible areas and limitations — what was not inspected, and why.
    • Prioritised recommendations — which systems need action, in what order, and which do not.
    • Re-inspection or verification advice — when to look again, and how cleaning will be verified.

    2. Understanding the results

    MethodWhat the number meansWatch out for
    Deposit Thickness Test (DTT)Thickness of dry deposit on the duct surface, in microns (µm), read on site.DTT is only reliable on suitable flat, rigid metal surfaces with dry deposits. Readings from spiral, lined or greasy ductwork should be questioned.
    Vacuum test (EVT, formerly PVT)Mass of dust from a defined template area (typically 100 × 100 mm), in g/m² or mg/m², found by weighing.Check the sample area, how many samples were taken and that each result traces back to a location.
    Wet Film Thickness Test (WFTT)Depth of wet or soft grease, in microns, measured with a comb gauge.Used for kitchen extract under TR19 Grease — not for dry dust in general ductwork.
    Visual inspectionCondition, visible deposits, damage and debris.Useful and necessary, but not a quantitative result on its own.

    Results should be compared with the TR19 criteria for that system type and risk. A single high reading does not always mean a whole system needs cleaning; a single low reading does not prove a system is clean. Look for enough test locations to represent each system — as a rule of thumb, at least three per system, and more for larger or more complex systems.

    3. Outcome labels in TR19 Air Version 2

    Version 2 formalises post-work reporting. After cleaning, the contractor's Post-Work Verification Report should state one of four outcomes for each system:

    OutcomeWhat it means for you
    Full CleanThe whole system was cleaned. Expect before-and-after photos and test results at the same locations.
    Partial CleanOnly part of the system was cleaned. The report should show exactly which sections, and why the rest was excluded.
    Inspection (Outcome 'Clean')The system was inspected and did not need cleaning.
    Inspection (Outcome 'Not Clean')The system was inspected and needs cleaning that has not yet been done — this is an open action on your records.

    4. Red flags

    • A 'certificate' with no test results, locations or photographs behind it.
    • One summary result for the whole building instead of results by system.
    • No mention of inaccessible sections — every building has some.
    • The same company recommending cleaning, carrying it out and signing it off, with no independent verification.
    • DTT readings reported from spiral or lined ductwork with no explanation.
    • Post-clean results taken at different locations from the pre-clean results.
    • No re-inspection date or verification plan.

    5. Questions to ask whoever wrote the report

    • Which edition of TR19 did you assess against?
    • Why did you choose this test method for each system?
    • How did you choose the test locations, and how many per system?
    • Which parts of the system could you not access?
    • Which systems do not need cleaning — and why?
    • How will cleaning be verified, and by whom?

    6. What to do next

    If the report is clear and complete, use it to plan any cleaning as a defined scope and put the next inspection in your PPM schedule. If it leaves you with questions, or you want a second opinion before committing to cleaning, an independent assessor can review the report or re-test key systems.

    About Green Air Monitoring

    Green Air Monitoring provides independent ventilation hygiene assessments for commercial buildings. We assess, specify and verify — we never clean.

    This guide is general information and does not replace BESA TR19® or professional advice for your building. TR19® is a registered trademark of the Building Engineering Services Association.