Guide

    Beyond the Thermostat: What Makes a Workplace Feel Healthy?

    A stable temperature reading won’t settle every comfort complaint. Learn how UK facilities teams assess indoor environmental quality and act on it.

    28 October 202611 min read
    Last reviewed:

    The office looks ready for the working day. The lights are on, the meeting rooms are booked and the temperature display shows an unremarkable number. Then the first comments arrive. One corner feels stuffy. Another is too cold. A team avoids a particular meeting room, although nobody can quite agree why. On paper, the building is operating. In practice, its occupants are telling a more complicated story.


    For the person managing the premises, this can be frustrating. An isolated reading may appear satisfactory while the complaints keep returning. Replacing one setting with another can shift the problem across the floor. Meanwhile, the conversation becomes less about the building and more about whose expectations are reasonable.


    At Green Air Monitoring, we believe that conversation becomes more productive when people’s experiences and measured conditions are considered together. Indoor air quality is an important part of the picture, but a workplace is also experienced through temperature, air movement, light and sound. A useful assessment starts by understanding the question, then gathers evidence capable of answering it.

    A broader view of the occupied building

    The British Standard BS 40102-1:2023 offers a useful framework for this wider view. BSI describes it as covering measurement, monitoring and reporting of indoor environmental quality in occupied non-domestic buildings, including existing premises. Its scope brings together air quality, light quality, thermal comfort and acoustic or soundscape quality. BSI currently lists the standard as current.


    That breadth matters because a complaint does not arrive neatly labelled by discipline. “The air feels wrong” may be the first description of an uncomfortable room, rather than a diagnosis of a particular pollutant. Beginning with a predetermined answer can narrow the investigation before anyone has properly understood what happens in the space.


    The framework also provides a useful reminder about scope. A routine indoor air quality survey is not automatically a complete assessment against every part of an indoor environmental quality standard. If a client wants a formal evaluation or rating, the brief needs to identify the required disciplines, methods and evidence. The name of a standard should never stand in for that agreement.


    For many UK building teams, the immediate need is more focused. They want to understand recurring complaints, establish conditions before a change or identify where further investigation is justified. A proportionate assessment can answer those questions without promising a complete certification exercise. The value lies in a clear decision, supported by evidence that fits the task.

    Begin where people actually work

    A floor plan tells you where walls and desks are located. It does not necessarily show how the space is used on a busy Tuesday, which meeting rooms are consistently overbooked or where people move when they feel uncomfortable. Those details belong in the opening conversation because they help determine where measurements will be meaningful.


    We would encourage a facilities manager to assemble a practical account of the building. Identify the occupied areas, normal working hours, different activities and any recent changes. Note which rooms generate comments and whether those comments concern a particular time, weather condition or event. This is useful context, rather than an attempt to diagnose the issue before the survey.


    Include the building’s quieter spaces as well as its busiest ones. An area where occupants report no difficulty can provide a useful comparison, provided its different conditions are recognised. The objective is to understand variation across the premises, not simply to collect a set of readings wherever access happens to be convenient.


    Shared buildings introduce another layer. A tenant may have control over furniture and room bookings while the landlord controls ventilation or central heating. Understanding these arrangements helps turn a finding into an action. A technically sound report is of limited use if nobody knows which organisation can change the condition it identifies.

    Treat feedback as evidence, not a verdict

    Occupant feedback is valuable precisely because people experience the building over time. They may notice that a room changes after lunch, that an odour follows a particular activity or that one location becomes uncomfortable when the sun moves across the façade. A short visit can miss patterns that regular users recognise immediately.

    Feedback still needs careful handling. A reported headache, for example, does not establish that a building pollutant caused it. Environmental assessment should not become medical diagnosis. Ask about the location, timing and circumstances of a concern while allowing occupational health or clinical professionals to address individual health questions where appropriate.


    Questions work best when they invite description rather than suggest a cause. “When does the room become uncomfortable?” is more useful than “Does the ventilation make you ill?” It leaves room for observations that the initial enquiry may not have anticipated. It also avoids encouraging a single explanation before measurements and records have been considered.


    Communicate how the information will be used. A building team usually needs patterns and locations, rather than unnecessary personal details circulated through a maintenance report. A respectful process encourages participation and helps keep the discussion focused on conditions that can be investigated and improved.

    Match measurements to the question

    There is no benefit in ordering a long list of measurements simply because they are available. The assessment should explain why each parameter is relevant, when it will be measured and how the result will inform the decision. That makes the eventual report easier to interpret and reduces the temptation to treat every number as equally important.


    For a concern about a busy meeting room, occupancy and ventilation arrangements may be central to the scope. For an unusual odour following refurbishment, information about materials, activities and timing may direct a different investigation. A thermal comfort concern may require attention to where people sit and the conditions around them, rather than reliance on a wall display alone.


    Our indoor air quality assessment work supports this process by examining relevant conditions in occupied buildings. The survey brief should make clear which questions are being addressed and which fall outside it. A targeted scope is often more informative than a broad promise to test the air for everything.


    It is equally important to distinguish a result from an explanation. A measurement may show a pattern worth investigating without identifying the source. Conversely, a result collected during an unusually quiet period may not represent the room’s busiest use. The interpretation needs to account for what was happening, as well as what the instrument recorded.

    Why the thermostat cannot settle every argument

    Air temperature is part of thermal comfort, but it is not the whole assessment. HSE identifies other relevant factors, including radiant conditions, air movement, humidity, clothing and work activity. This helps explain why people can experience a room differently even when a single temperature reading remains stable.


    For a facilities manager, the practical implication is to investigate the occupied position. A reading beside a control panel may not describe the conditions at a desk near glazing or directly beneath an air outlet. The useful question is where the person works, what they experience there and which relevant conditions need to be examined.


    Consider a hypothetical office where two teams report different problems on the same floor. One describes afternoon warmth near a glazed elevation; the other reports discomfort beneath supply outlets. An average temperature for the floor could conceal both experiences. A sensible assessment would examine the locations and timing separately before proposing changes to the whole system.


    This example also illustrates why an apparently simple adjustment needs a clear purpose. Changing a general setpoint may alter conditions throughout the floor while leaving the underlying local issue unresolved. The building team needs enough information to choose a response that addresses the concern at its source, then check whether it has helped.

    Keep fresh air and temperature in the same conversation

    Temperature and ventilation are often discussed by different people, although occupants experience them together. A room can feel cool without that observation establishing its fresh-air provision. HSE’s workplace ventilation guidance distinguishes the introduction and removal of air from the wider question of thermal comfort. Both deserve attention in an occupied building.


    The management challenge is to avoid solving one complaint by creating another. If windows are part of the ventilation arrangement, for example, a winter draught complaint should prompt a considered review of how the space operates. Simply asking everyone to tolerate discomfort is unlikely to produce a reliable long-term arrangement.


    The same applies when building use changes. A room that once accommodated occasional individual work may now host long group meetings. The assessment brief should record that change rather than assume the original arrangements remain appropriate. The design history is useful, but present use is what the current building team must manage.


    These discussions are particularly relevant to UK workplaces moving between heating and warmer-weather operation. An assessment undertaken in one set of conditions should state that context. Where there is a genuinely seasonal concern, the management plan should explain how the other condition will be reviewed rather than imply that one visit has answered every future question.

    Read the results as a picture, not a league table

    A report can be technically detailed and still leave its reader unsure what to do. The most useful presentation connects each finding to a location, an operating condition and a practical implication. It distinguishes a confirmed issue from an observation that needs further investigation, and it identifies the limitations of the evidence.


    This is especially important when a result is close to a chosen assessment criterion. The report should explain the source and purpose of the criterion, the measurement period and the relevance to the building. A health-based guideline, a design recommendation and a contractual target are not interchangeable simply because each is expressed as a number.


    Avoid reducing a complex building to a reassuring overall label that hides local concerns. A favourable result in most rooms does not resolve a recurring problem in one room. Equally, a finding in a particular area should not automatically become a statement about every part of the property. Good interpretation preserves those boundaries.


    Where a formal standard-based score is commissioned, it should be supported by the corresponding assessment method. Where it is not, the report can still provide clear priorities without borrowing the appearance of a certification. The reader should understand what the work demonstrates, rather than needing to infer it from a badge or headline.

    Turn findings into decisions people can own

    The action plan is where an assessment earns its place in building management. Each recommendation should identify the condition being addressed, the responsible person or organisation and the evidence needed to close it out. “Improve ventilation” is a starting point for discussion, not a sufficiently defined instruction for a busy property team.


    A more useful action might be to investigate whether a room’s current use is reflected in the ventilation arrangements, with the appropriate engineer reviewing performance and the building team documenting the outcome. The assessment does not need to invent the engineering solution. It needs to make the next step clear and proportionate to the finding.


    Some actions will concern operation or communication rather than capital expenditure. Others may require specialist design, repair or further testing. Separating these categories helps managers plan resources and avoids treating every environmental concern as a reason to replace equipment. The decision should follow the evidence, not the availability of a particular product.


    Our building health assessment service provides a route into that discussion. A useful enquiry describes the building, the people using it and the concern to be resolved. From there, the assessment can be scoped around the information the client actually needs to make a decision.

    Check the improvement in the occupied room

    Completion of an action does not, by itself, demonstrate that the original concern has been resolved. A maintenance record can confirm that work took place. Verification asks what changed in the relevant space and whether the intended outcome was achieved. The two records serve different purposes and are most useful when kept together.


    Agree the verification approach while planning the action. If the concern occurs during full meeting-room use, a check carried out only when the room is empty will leave an obvious gap. If it relates to a particular operating period, that period should be considered in the follow-up. Comparable conditions make the results more meaningful.


    Ask occupants about the specific concern again, without expecting universal agreement on comfort. Their feedback can show whether the practical experience has changed, while measurements and operating records provide another part of the evidence. Improvement is easier to understand when those accounts are considered together rather than used to contradict one another.


    For a persistent or intermittent issue, a reactive indoor environmental investigation may be more useful than simply repeating the original survey. The next stage should address what remains uncertain. That might be timing, location or a suspected pathway; it should not be a repetition of work merely because the first answer was incomplete.

    Give the building a usable memory

    The benefit of an assessment extends beyond the day it is completed when its records remain accessible. Keep the scope, findings, actions and follow-up together. Record material changes in room use or operating arrangements. The next person managing the building should be able to see why a decision was made and what evidence supported it.


    This creates a practical reference for future changes. Before a floor is rearranged or a room is allocated a new use, the team can review the earlier findings and identify what may need reconsideration. The assessment becomes part of the building’s management history rather than a document retrieved only when a complaint returns.


    A healthy workplace is not established by one comfortable afternoon or one tidy set of readings. It is supported by a continuing ability to notice concerns, investigate them properly and act on what the evidence shows. That approach gives facilities managers something more useful than a promise of perfection: a clear way to understand and improve the places where people work.

    indoor environmental quality; workplace thermal comfort; office indoor air quality; bs 40102-1; workplace ventilation; occupant comfort complaints; building health assessmenthealthy workplace environment

    Need Indoor Air Quality Testing?

    Get a no-obligation quote. We provide IAQ testing, ventilation assessment and environmental monitoring across London and the South East.

    We use cookies to measure how our site and adverts perform. You can accept or reject non-essential cookies. Privacy policy